Home
News
Latest news
News overview
Upcoming immersions
About us
Ambition
Safety
Quality
Standard scope of activities
Organisational structure
Specialization
Specialization
Immersion techniques
OTAO
Innovations
Innovations and optimizations
Re-usable modular steel bulkheads
External positioning system (EPS)
Self Propelled Diving Bell
Unconventional suspensions/supports of metro station Amsterdam
Projects
Overview projects
Working at Mergor
Would you fit in
Training
Scope
Contact
Address
Questions and comments
Machine name: NLUTSRSP03
Go to site
Colijn
CRS Verkeersgeleiding
DMI
Geocon
Molhoek
OTN
Reef Infra
Strukton Bouw
Strukton Civiel
Strukton Civiel Projecten
Strukton Engineering
Strukton Groep
Strukton Industriebouw
Strukton Infratechnieken
Strukton Integrale Projecten
Strukton Parkeren
Strukton Prefab Beton
Strukton Rail
Strukton Worksphere
Tensa
Terracon
Tubex
Language
Dutch
Home
Projects
'we like the Dutch approach'
Know what you are doing
All activities are performed by a tightly knit team of highly qualified specialists, each of whom has a thorough understanding of the importance of a smooth sinking project.
Mergor
Address
North/South line, IJ-elements, Amsterdam
The Noord/Zuidlijn in Amsterdam, will connect the northern and southern parts of the city. The metro line will cross the river IJ, this connection is created with an immersed tunnel, the tunnel consists of 3 tunnel elements.
North/South line, Metro Station CS, Amsterdam
The Noord/Zuidlijn in Amsterdam, will have a metro station underneath the existing central train station of Amsterdam. The train platforms of the metro station will be constructed inside an immersed tunnel element (CS-element).
Busan-Geoje Fixed Link
The immersion tunnel is part of the Busan-Geoje Fixed Link – an extraordinary project that helps resolve a significant economic and social issue.
Failure is not an option
One of the most high-risk moments in tunnel construction is when the tunnel elements are immersed. Failure is not an option, as the potential (economic) damage in the event of a delay is too great. Naturally, a specialist is selected who has proven capabilities in difficult immersion projects. Mergor is one of the world's top players in this market.
Mergor’s field of expertise comprehends the engineering and preparations for tunnel immersion projects, as well as their execution including the relevant marine and diving activities. We like to relieve our partners and clients of as much work as possible. For example, in addition to the design and engineering of temporary and permanent structures, we also take responsibility for the work planning, schedules, checklists and detailed method statements for the entire immersion process. Naturally, operations are always preceded by extensive risk analyses. The survey required during immersion in order to enable precise positioning of the tunnel units is performed by our sister company Geocon
Mergor,
underwater construction is a Strukton Company
Visiting Address
Westkanaaldijk 2,
3542DA UTRECHT
The Netherlands
Postal address
P.O.Box 1025
3600 BA MAARSSEN
The Netherlands
T: +31 (0)30 248 69 11
F: +31 (0)30 248 67 76
E-mail:
info@mergor.com
News
Strukton at International Tunnel Congress WTC 2012 in Bangkok
09|05|2012 - Strukton takes part in the World Tunneling Congress 2012 of ITA-AITES in Bangkok. From May 18th up to and including May 23rd Strukton is present in stand H4 and H5.
Honourable mention for Strukton Afzinktechnieken at the International Tunnelling Awards 2011
02|12|2011 - Strukton Afzinktechnieken Mergor has received an honourable mention at the International Tunnelling Awards 2011 in the category Technical Innovation of the Year for the Busan Geoje Fixed Link project. The announcement was made in Hong Kong on 1 December.
Strukton project ‘Korean Superlink‘ Sunday september 25th at 21:00 on National Geographic Channel
06|09|2011 - On Sunday, September 25 at 21:00 the world premiere of the National Geographic Megastructures program "Korean Super Link" takes place on Dutch television.