Closed front drilling on the A2 motorway 


The work comprises the excavation-free installation of a Ø 1,600 millimetre waterpipe at the height of hectometer pole (HMP) 58 beneath the A2 Main Road. The boring is part of the project that must ensure the drainage in the process of diverting the A2 Main Road. The work in progress is limited to the installation of the Ø1,600 millimetre waterpipe and its equipment with three drains with connections.

The client is Eneco Energie Infra Utrecht BV.



[EN]Client Eneco 
Country The Netherlands
Location Utrecht 
Delivery date
01 | 10 | 2006
Size
[EN]Activity Infratechnieken