Continuous analysis during jacking activities 




In infrastructure activities, no two projects are identical. In addition to years of experience, we have a wide variety of jacks, hydraulic pumps and moving equipment that ensure that we can provide a solution for any project. We can also provide temporary supports for buildings and bridges, underpin sinking buildings and erect struts for sheet piling. The work is always preceded by an in-depth analysis of the necessary capacity, the optimum jacking positions and the positioning of the stacks that are to be moved. The jacks are then arranged to form a reliable hydraulic system that places a minimum of stress on the structures being jacked. We also study the transfer of jacking forces to the existing structure and whether guides should be used to optimise stability.