Mergor’s activities can be divided into a large number of activities spread across the various phases of the immersion process and related process phases. All of these activities are combined in what Mergor calls its Standard Scope. The activities are divided across the following phases:
Phase 0 Phase 1 Phase 2 Phase 3A Phase 3B |
The design paper Design & engineering Preparations Execution in (construction) dock and at temporary mooring site Execution at immersion location |
For a detailed list of all of the activities in the various phases, download the Standard Scope here.